The Status Quo Audit

The Cost of Doing Nothing.

Independent assessments have indicated Plain Local Schools' current facilities are reaching their limits. Investing now captures state matching (Source ↗)—waiting could cost the community in lost savings.

Estimated Renovation for All Facilities
$208 Million

Total estimated cost to renovate existing buildings without adding new capacity or modern learning tech (Source ↗). This "Status Quo" cost is 100% locally funded—zero state matching.

0% State Matching
71-Year Average Age
83%
Avg. Cost to Repair vs. Replace

Building-by-Building Health

Facility Condition Index (FCI): The ratio of renovation costs vs. replacement costs. Above 30% is critical; Plain Local averages 83%.

Glenwood Intermediate

68 Years Old
$49.3M
Repair Backlog
Cost to Repair vs. Replace95%
Critical Systems Failure
Most Central Site
Significant Maintenance Debt

Middlebranch Elementary

94 Years Old
$26.0M
Repair Backlog
Cost to Repair vs. Replace93%
Septic System
Soil Stability Concerns
Access Challenges

Frazer Elementary

72 Years Old
$15.4M
Repair Backlog
Cost to Repair vs. Replace88%
Severe Site Limitations
Topography Issues
Student Displacement Risk

Barr Elementary

59 Years Old
$16.6M
Repair Backlog
Cost to Repair vs. Replace82%
All-Electric Original
Well Water
Railroad Noise Pollution

Warstler Elementary

64 Years Old
$15.5M
Repair Backlog
Cost to Repair vs. Replace81%
Aging Infrastructure
Field Loss Risks
Middlebranch Ave Traffic

Little Eagles Preschool (Day)

64 Years Old
$10.5M
Repair Backlog
Cost to Repair vs. Replace81%
Demolition Recommended
HVAC Obsolescence
Entry Logistics

Taft Elementary

67 Years Old
$22.4M
Repair Backlog
Cost to Repair vs. Replace80%
Demolition Recommended
Structural Fatigue
Logistical Gaps

Avondale Elementary

93 Years Old
$10.4M
Repair Backlog
Cost to Repair vs. Replace75%
Small 5.98 Acre Site
5 Separate Parcels
Displacement Required

Oakwood Middle

58 Years Old
$41.2M
Repair Backlog
Cost to Repair vs. Replace71%
Career Tech Space Gaps
Auditorium Needs
Maintenance Backlog

The 20th Century Learning Gap

Direct instruction (lecture style) is still relevant but no longer the sole standard. Our buildings prevent modern student-based collaborative learning.

Tech & Infrastructure Exclusion

Avondale and Frazer sites are literally too small (under 6 acres) to rebuild modern facilities without massive student displacement.

Operational Drain

Maintenance staff and purchasing for emergency repairs averages 11.55% of the total budget. Modern buildings cut this by half.